CityKY
Posted
Oct 9, 2026
Nov 12, 2026
Wastewater Treatment Plant Additions and Improvements RFP
The project will include the following described construction: Furnishing and installation for the construction of the additions and modifications to the Adairville Wastewater Treatment Plant including new headworks and influent pumps, proposed aeration basin, electrical control building, blowers, piping modifications, new return activated sludge pump station, modifications to the existing aeration tanks / clarifiers, modifications to existing waste activated sludge pumps, new sludge dewatering facility, additional generator, post aeration, demolishing of existing structures, piping, equipment, plumbing, heating, ventilation, electrical, grading, and appurtenances as required for the modifications and improvements to the existing treatment plant and all other work as shown on the Construction Drawings or indicated in the Contract Specifications.
