Howard County Bridge #32 Replacement
Posted
Oct 2, 2026
Dec 21, 2026
Removal of the existing 16' long concrete structure, installation of a new, prestressed concrete next beam, type 28D bridge. Additional work includes, but is not limited to, installation of new guardrail and guardrail transitions in all four quadrants, new pf-1 bridge railing, and placement of new riprap for scour countermeasures; and all incidental work required, as specified in the contract document and plans.

