South Line Air Relief Valve Replacement - Phase 2
Posted
Sep 17, 2026
Oct 13, 2026
Work includes south line air relief valve replacement.
Track open bid opportunities, contracts, public meetings, and key contacts for Gulf Coast Water Authority.
Active opportunities open for bidding
Posted
Sep 17, 2026
Oct 13, 2026
Work includes south line air relief valve replacement.
Posted
Sep 15, 2026
Oct 14, 2026
Work inlcudes 500 SY rmv (7"-13") trt/untrt base & asph pav; 349 CY excav (roadway); 561 CY embank (fnl)(dc)(ty b); 7 SY fl bs (cmp in plc)(ty a gr 1-2) (8"); 276 SY hydro mulch seed (perm rural sandy); 8 TN lime (com or qk)(slurry) or qk(dry); 467 SY lime trt (subgrade) (8"); 189 TN asphalt trt base (gr 2)(pg 64); 94 GAL prime coat (mc-30); 71 ton d-gr hma ty-d sac-b pg70-22; 42 GAL tack coat; 128 lf trench safety system. See attached file.
Posted
-
Oct 15, 2026
Work of the contract is for the construction of the air scour a replacement. Work consists of modifications to the existing air scour system to replace air scour blower a, establish independent electrical feeds for air scour blowers a and b, relocate existing air scour b control equipment, install the new air scour a control system, and perform associated mechanical, civil, electrical, instrumentation, controls, demolition, restoration, testing, startup, and commissioning work.
Key metrics and characteristics
City
The city where this buyer is located.
Texas City
County
The county where this buyer is located.
Galveston
Address
Physical address of this buyer.
3630 Fm 1765
Phone Number
Contact phone number for this buyer.
(409) 935-2438
Zip Code
Postal code for this buyer's location.
77591
Propensity to Spend
How likely this buyer is to spend on new technology based on operating budget trends.
AI Adoption Score
How likely this buyer is to adopt new AI technologies.
Startup Friendliness
How often this buyer champions startups and early adoption.
Latest Budget Year
Unlock to view
Operating Budget
Unlock to view
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
AI-ranked best-fit opportunities before bid boards
Auto-drafted, compliance-ready outlines & boilerplate
Competitor & pricing intel from past awards
Board meetings and strategic plans from Gulf Coast Water Authority
The board discussed various operational and administrative items, including canal crossing agreements with CenterPoint Energy and Fort Bend County, and the second quarter investment report. Key agenda items included the approval of contracting services for access road construction at the Thomas Mackey Water Treatment Plant, the designation of National Public Works Week, and administrative resolutions concerning public information requests, records management, and by-law updates. The board also adopted revised water conservation and drought contingency plans. Reports were provided on emergency management strategies, public relations outreach, regional water conditions in the Brazos River Basin, and the Whitney Lake Reallocation Feasibility Study.
The committee discussed safety procedures involving overhead hazards, received a presentation on the Gridbee Aeration Treatment Process to manage trihalomethane (THM) levels, and reviewed reports on reservoir levels, canal infrastructure maintenance, and water quality data. Updates were provided on the South Line Interconnects Plugging Project, a water line replacement project, and the upcoming annual chlorine maintenance schedule. Additionally, the committee evaluated strategies for reducing THM formation through operational adjustments and future capital investment considerations.
Public-sector contacts connected to Gulf Coast Water Authority.
Native sync to Salesforce & HubSpot
The board discussed safety protocols, specifically ladder safety. It addressed the schedule for future committee meetings and approved several consent items, including a canal crossing agreement, IT infrastructure services, a memorandum of understanding for dredge material disposal, multiple water supply and system contracts, and a resolution for grant funding assistance. The board also approved an engagement letter for federal government relations services and a resolution regarding priorities for the upcoming Texas legislative session. Management and departmental reports covered public relations efforts, water conditions in the Brazos River Basin, operations and maintenance updates for the water treatment plant and canal systems, and ongoing regional and state water-related initiatives.
Extracted from official board minutes, strategic plans, and video transcripts.
Track Gulf Coast Water Authority meetings, strategic plans, and budget discussions before the public bid appears.
Early signals from meeting minutes and plans
Vendor mentions and competitor tracking
Decision timeline from discussion to RFP
Quotable insights from buyer leadership