CityCA
Posted
Sep 18, 2026
Oct 21, 2026
Moorpark Road Storm Drain Pipe (CMP) Lining and Repair at Pembridge Street (MI 2623) RFP
Storm drain pipe (CMP) lining and repair. Work includes - 1,200 LF 60" corrugated metal pipe lining; see attached file.
Description: Work consists of perform a storm drain pipe lining project. work includes, installation of UV CURED CIPP SPEC lining within the existing CMP pipe, mobilization and demobilization, traffic control, repairing pipes for adequate lining.
City · UT, US
Solicitation files and supporting documents for this bid.
Decision makers connected to this RFP from City of South Jordan.
Adjacent opportunities open for bidding right now.
CityCA
Posted
Sep 18, 2026
Oct 21, 2026
Storm drain pipe (CMP) lining and repair. Work includes - 1,200 LF 60" corrugated metal pipe lining; see attached file.
CityPA
Posted
Oct 9, 2026
Nov 12, 2026
Re-lining an existing storm pipe within the Woodland Plaza Apartments' parking lot.
CityCA
Posted
Sep 22, 2026
Oct 20, 2026
Work consists of constructing a new storm drain system, beginning with the removal and reconstruction of the existing catch basin, while retaining the existing inverts of the existing laterals. will also include the construction of an additional catch basin and 12" reinforced concrete pipe (RCP) connecting to the main line via a proposed junction structure.
CountyFL
Posted
Aug 20, 2026
Oct 20, 2026
Work includes consist of repair and/or restore stormwater lines, including installation of a resin impregnated cured in place pipe (ricipp) lining including site preparation, clean up and hauling off unsuitable materials.