Posted
Sep 30, 2026
Oct 23, 2026
Repair & Replace Flooring in BLDG 10A RFP
The contractor shall provide ALL labor, materials, tools, equipment, transportation, and supervision necessary for repair of the damaged and swelling LVT flooring including proper subfloor preparation, moisture-barrier application, all aspects of applying new LVT in the affected areas, and site cleanup. The contractor shall remove damaged LVT floor planks and associated adhesives from the designated areas. This includes transporting and disposing of all waste in compliance with local, state, and federal regulations. The contractor shall inspect the underlying concrete subfloor after removal of the damaged LVT to identify any cracks, uneven surfaces, or damaged substrate conditions requiring patching or remediation. Any and all subfloor preparation necessary to ensure proper adhesion and performance of the moisture barrier and LVT flooring planks shall be completed as part of this effort.
