Higher EducationSC
Posted
Oct 13, 2026
Nov 5, 2026
Singleton Energy Plant Boiler Replacement RFP
Work includes to remove and replace (2) boilers with (2) 3,500 mbh input condensing boilers in a phased approach at the singleton building energy plant.
Description: Coastal Carolina University seeks bids to remove two boilers at the Singleton Building energy plant and replace them with two 3,500 MBH input condensing boilers in a phased approach. The design-bid-build project has an estimated construction cost of $400,000 to $490,000 and requires the prime contractor to hold a Heating (HT) license. Bids are due November 5, 2026, at 2:00 p.m.
HigherEducation · SC, US
Solicitation files and supporting documents for this bid.
Decision makers connected to this RFP from Coastal Carolina University.
Adjacent opportunities open for bidding right now.
Higher EducationSC
Posted
Oct 13, 2026
Nov 5, 2026
Work includes to remove and replace (2) boilers with (2) 3,500 mbh input condensing boilers in a phased approach at the singleton building energy plant.
CityOH
Posted
Oct 12, 2026
Nov 5, 2026
The City of Dayton seeks a contractor to remove the existing hot water boilers and boiler recirculation pumps at the Miami Water Treatment Plant and install in-kind replacements. Bids are accepted electronically through QuestCDN, and a pre-bid meeting is scheduled for October 27, 2026, at 10:00 a.m. at the plant. The bid portal is set to open by October 12, 2026, and bids are due at noon EST on November 5, 2026.
North Carolina Department of Adult Correction
State AgencyNC
Posted
Sep 22, 2026
Nov 5, 2026
Work includes boiler replacement.
CityMA
Posted
Sep 8, 2026
Oct 21, 2026
The scope of the work under this division, without limiting the generality thereof, consists of furnishing all labor, material, equipment, scaffolding, power, tools and rigging, except as otherwise specified, and performing all work as necessary to fully complete the hvac work indicated.