Northern Lehigh School District
School DistrictPA
Posted
Sep 14, 2026
Oct 15, 2026
Description: This project aims to convert existing office space into a dedicated server room to support an ongoing distributed control system (dcs) replacement project where new server equipment will be procured. The new server room should have dedicated air conditioning, environmental monitoring, fire suppression, and power distribution.
SpecialDistrict · CA, US
Solicitation files and supporting documents for this bid.
Decision makers connected to this RFP from West Basin Municipal Water Dist.
Adjacent opportunities open for bidding right now.
Northern Lehigh School District
School DistrictPA
Posted
Sep 14, 2026
Oct 15, 2026
Work include Phase A: Water Testing, Sizing, and System Selection. Water Analysis & Sizing: Test raw water hardness (gpg/ppm), iron, manganese, total dissolved solids (TDS), and pH at the site connection. Phase B: Room Construction & Enclosure. Architectural Enclosure: Construct a dedicated room/enclosure to house the water softener and brine storage tanks in an area designated by the District Director of Operations. Phase C: Plumbing, Electrical, and Commissioning. Plumbing Connections: Tie into the main water service line, including hardwater bypass piping, isolation valves, pressure gauges, and backflow preventer per local plumbing codes.
Midland Independent School District
School DistrictTX
Posted
-
Oct 22, 2026
Provide telecom room mini-split installation.
CountyMD
Posted
Sep 28, 2026
Oct 26, 2026
Provide turnkey modernization of the audiovisual systems.
Arkansas Game and Fish Commission
State AgencyAR
Posted
Sep 4, 2026
Oct 21, 2026
Seeking qualified contractors to provide all labor, materials, equipment, and permits necessary for the construction of two new bridge crossings and associated approaches.