Project consists of student center addition of approx 43,000 sf. Renovations of approx 5,000 sf. Existing roof replacement of approx. 31,000 sf. Project will be bid in two phases. Phase 1 will include demolition work, building concrete work, structural steel work, timber framing work, elevator work, electrical & low voltage, site utilities & storm water detention, site work & excavation. Phase 2 work to include masonry work, miscellaneous steel work, carpentry work, casework & millwork work, roofing work, glass &, glazing work, drywall & framing & acoustical work, rain screen terracotta, resilient flooring work painting work, tile flooring & wall tile work, terrazzo work, fire protection work, plumbing work, hvac work, electrical work, paving & curbs, landscaping. Bid packages: 02 ademolition work, 03 abuilding concrete work, 05a structural steel work, 06 a timber framing work, 14a elevator work, 26a electrical & low voltage, 31a site work site utilities & storm water detention.