Tangipahoa Parish School District
School DistrictLA
Posted
Oct 16, 2026
Dec 3, 2026
Ponchatoula High School 18 Classroom Addition and Cafeteria RFP
Provide classroom addition and cafeteria.
Description: Work includes furnishing and installation of the hurricane/storm shutter work associated with asi #06.
SchoolDistrict · FL, US
Solicitation files and supporting documents for this bid.
RFP documents aren’t available here yet.
Our team can help you find the original solicitation documents.
Request File RetrievalAdjacent opportunities open for bidding right now.
Tangipahoa Parish School District
School DistrictLA
Posted
Oct 16, 2026
Dec 3, 2026
Provide classroom addition and cafeteria.
Regional School Unit 30/Maine School Administrative District 30
School DistrictME
Posted
Oct 7, 2026
Nov 19, 2026
Work includes but is not limited to, selective demolition, earthwork, site utilities and site improvements, paving and landscaping. Work also includes asbestos abatement, concrete foundations and slab-on-grade, steel structure, steel joists and decking, roof membrane over roof insulation, masonry, metal stud partitions, metal siding, insulation, gypsum board walls and ceilings, acoustical ceilings, resilient flooring, ceramic tiling, carpeting, custom cabinets and fixtures, carpentry, metal doors, wood doors, metal frames, door hardware, painting, toilet accessories, foodservice equipment, gymnasium equipment, signage, fire protection and detection systems, security systems, electrical, and heating, ventilating, and air conditioning complete and ready for use.
School DistrictME
Posted
Oct 20, 2026
Nov 19, 2026
This RFP is for the construction of an addition and renovations to the Philip W. Sugg Middle School.
Fresno Unified School District
School DistrictCA
Posted
Oct 12, 2026
Oct 29, 2026
Fresno Unified School District seeks sealed bids to alter the existing administration building and make site modifications at Wawona Middle School. The prime contractor must hold a Class “B” license and attend a mandatory pre-bid conference and site walk on October 16, 2026; the project must be completed within 120 calendar days. Bids must include a certified or cashier’s check, or a bidder’s bond, for at least 10% of the total bid and be submitted through the district’s procurement portal by the deadline.
Decision makers connected to this RFP from Bay District Schools.