Closing soonMesa Drive Multi-Use Trail Extension RFP
Description: Work consists of mobilization and demobilization; implementing best management practices (bmp); implementing traffic control; construction surveying, staking, and survey monument restoration; distributing construction notices to affected businesses and residents; clearing and grubbing; utility company coordination and utility verification; removal and excavation of existing roadway improvements, subgrade preparation, clearing existing pavement surfaces of debris, soils, and other loose materials; construction of asphalt concrete (ac) pavement; construction of multi-use trail, including demolition and removal and/or relocation of existing conflicting materials, import/export of unclassified material or fill, grading and backfill, tree and vegetation removal, construction of pcc curb and gutters, pcc and decorative driveways, stabilized decomposed granite trail, redwood header boards, concrete railings, pcc gravity walls, decorative pilasters, and roadway improvements; utility adjustments and relocations, including trench repair; relocation of private mailboxes; storm drain improvements including relocation and construction of curb inlet with local depression and associated piping; traffic striping, pavement markings, pavement markers, and curb markings; traffic signing improvements; installation of curb drains; reconstruction of adjoining improvements at properties along mesa drive; repairs to impacted or damaged landscaping.