CD 51-7.7a – Catch Basin Replacement, Turtle Creek RFP
Catch Basin Replacement.
Description: The work generally consists of replacement of an existing catch basin and associated storm drainage improvements beneath and adjacent to the elevated sidewalk. Work includes excavation; installation of a new catch basin, manhole, storm drain piping, and associated drainage improvements; controlled density fill(CDF) backfill; temporary shoring and protection of existing improvements; pavement and surface restoration; and other related work.
City · OR, US
Solicitation files and supporting documents for this bid.
Adjacent opportunities open for bidding right now.
Turtle Creek Valley Council of Governments
Special DistrictPA
Posted
Oct 3, 2026
Oct 27, 2026
Catch Basin Replacement.
CityMA
Posted
Sep 29, 2026
Oct 22, 2026
Annual service contract for catch basin cleaning.
CityWV
Posted
Sep 29, 2026
Oct 15, 2026
Removing and installing approx., 1300 SY of concrete sidewalks, 2300 LF of concrete curbs, 25 decorative streetlights, conduit, and other miscellaneous items.
CityGA
Posted
Sep 28, 2026
Oct 29, 2026
Work includes demolition and replacement of sidewalks; extraction of memorial stamped bricks without breakage and re-installing these memorial bricks in the newly constructed sidewalks in the same location as their original placement; hauling and lawful disposal of all demolition debris; grading, compaction, and base preparation; installation and finishing of new concrete sidewalks using GDOT standards; installation of americans with disabilities act (ADA)-compliant curb ramps; installation of concrete ADA-compliant handicapped ramps as specified; installation of aluminum handrails as specified; restoration and cleanup of all disturbed areas; and traffic and pedestrian control necessary to complete the work safely.