CountyMO
Posted
Sep 29, 2026
Oct 26, 2026
Johnson County Bridge Replacement
The proposed work includes the construction of a 67'-7 7/8" long, single span, w33x118 steel I-girder bridge at 20-degree R.A. Skew and -6. 88% grade.
Description: The proposed work includes the construction of a 67'-7 7/8" long, single span, w33x118 steel I-girder bridge at 20-degree R.A. Skew and -6. 88% grade.
County · MO, US
Solicitation files and supporting documents for this bid.
RFP documents aren’t available here yet.
Our team can help you find the original solicitation documents.
Request File RetrievalAdjacent opportunities open for bidding right now.
CountyMO
Posted
Sep 29, 2026
Oct 26, 2026
The proposed work includes the construction of a 67'-7 7/8" long, single span, w33x118 steel I-girder bridge at 20-degree R.A. Skew and -6. 88% grade.
Ohio Department of Transportation
State AgencyOH
Posted
-
Oct 29, 2026
Work includes: in accordance with plans and specifications by removing an existing single-span steel bridge, abutments, and approach slabs and replacing with a single-span prestressed concrete box beam structure, semi-integral abutments on capped piles, and new approach slabs. Project also includes minor asphalt paving at approaches, guardrail upgrades, erosion control improvements and other related work. Major items feature 723.000 SY of pavement removal; 191.000 FT of guardrail removed; 55.000 CY of excavation; 57.000 CY of embankment; 150.000 FT of guardrail, type MGS; 911.000 SY of pavement planing, asphalt concrete; 43.000 CY of asphalt concrete base; 11.000 EA of prestressed concrete composite box beam bridge members; and 147.000 SY of reinforced concrete approach slabs.
Ohio Department of Transportation
State AgencyOH
Posted
-
Oct 29, 2026
Work includes: in accordance with plans and specifications by removing an existing single-span steel bridge, abutments, and approach slabs and replacing with a single-span prestressed concrete box beam structure, semi-integral abutments on capped piles, and new approach slabs. Project also includes minor asphalt paving at approaches, guardrail upgrades, erosion control improvements and other related work. Major items feature 723.000 SY of pavement removal; 191.000 FT of guardrail removed; 55.000 CY of excavation; 57.000 CY of embankment; 150.000 FT of guardrail, type MGS; 911.000 SY of pavement planing, asphalt concrete; 43.000 CY of asphalt concrete base; 11.000 EA of prestressed concrete composite box beam bridge members; and 147.000 SY of reinforced concrete approach slabs.
CountyIN
Posted
Oct 2, 2026
Dec 21, 2026
Removal of the existing 16' long concrete structure, installation of a new, prestressed concrete next beam, type 28D bridge. Additional work includes, but is not limited to, installation of new guardrail and guardrail transitions in all four quadrants, new pf-1 bridge railing, and placement of new riprap for scour countermeasures; and all incidental work required, as specified in the contract document and plans.
Decision makers connected to this RFP from Johnson County.