School DistrictSC
Posted
Jun 9, 2025
Jun 28, 2029
On-Call Electrical Services Fixed Price Bid
Provide on-call electrical services.
Description: Wayne-Finger Lakes BOCES is soliciting electrical services for participating facilities, including installations, routine repairs, emergency repair work, and scheduled modifications to electrical and control systems. Contractors are expected to provide labor, equipment, materials, and supervision for as-needed, job-specific assignments and demonstrate competence with primary and secondary systems from 110 to 480 volts. Proposals establish hourly labor rates based on New York State prevailing wage rates for the applicable electrical trades.
SchoolDistrict · NY, US
Solicitation files and supporting documents for this bid.
Decision makers connected to this RFP from Ontario-Seneca-Yates-Cayuga-Wayne Board of Cooperative Educational Services.
Adjacent opportunities open for bidding right now.
School DistrictSC
Posted
Jun 9, 2025
Jun 28, 2029
Provide on-call electrical services.
Posted
Oct 13, 2026
Oct 29, 2026
Wayne-Finger Lakes BOCES is soliciting bids for cooperative plumbing services under WFL 2027-55PW. The accessible notice does not provide the detailed scope or bid documents. Bids are due October 29, 2026, at 3:00 p.m. EDT.
Monroe 2-Orleans Board of Cooperative Educational Services
School DistrictNY
Posted
-
Nov 5, 2026
Purchase of electric supply from energy services companies (ESCOS).
CityFL
Posted
Sep 30, 2026
Oct 29, 2026
Work includes 1 SF pressure clean entire court surface; 1 SF remove/repair/replace damaged asphalt area; 1 SF remove/repair/replace damaged concrete area; 1 LF patch all cracks with court patch binder; 1 SF flood court; patch and level all areas lower than 1/16"; 1 LF cut out and patch root intrusions; 1 sf apply concrete primer (concrete courts only); 1 SF resurface court using acrylic court resurfacing material applied at manufacturers recommended rate of coverage ; 1 SF apply fiberglass membrane patches over large cracks and repairs; 1 SF color coat resurfacing, first coat applied at manufacturers recommended rate of coverage. See outside link.