Community Center Park Improvements Project Phase 1A and 1B RFP
Work includes 2,146 CY earthwork excavation (mag 205); 1,348 CY surplus material (mag 205); 1,331 SY subgrade preparation (mag 301), 8" scarify and recompact; 407 SY subgrade preparation (mag 301), 6" under curb, sidewalk, and ramps; 238 ton 3" ac, mag 3/4" mix, single lift (mag 321); 222 CY abc, 6" pavement section (mag 310 & 702-1); 45 CY abc, 4" under curb, sidewalk, and ramps (mag 310 & 702-1); 3,378 SF sidewalk and ramps (mag 340); 554 sf 3' valley gutter (mag 340); 559 LF 6" single curb, mag 222, (mag 340); 4 EA curb and gutter transition, qcsd 221q (mag 340). See attached file.