CityMS
Posted
Oct 15, 2026
Nov 19, 2026
North Main Street Area Infrastructure Improvements - Phase 1 RFP
Work inlcudes sewer replacement & rehabilitation.
Description: Work includes traffic control 1 ls, construct 12" PVC water pipe 30 lf, construct 10" PVC water pipe 20 lf, construct 8" PVC water pipe 5450 lf, construct 6" PVC water pipe 40 lf, see outside link.
City · CA, US
Solicitation files and supporting documents for this bid.
Decision makers connected to this RFP from City of Fullerton.
Adjacent opportunities open for bidding right now.
CityMS
Posted
Oct 15, 2026
Nov 19, 2026
Work inlcudes sewer replacement & rehabilitation.
CountyFL
Posted
Oct 1, 2026
Nov 6, 2026
Construct ±0.443 miles of rural section asphalt roadway with side ditches, conversion of an existing borrow pit to a storm water management facility, new storm sewer collection system, new water main and sanitary sewer force main, traffic signs and traffic paint/markings. Work includes 1 LS mobilization, 1 LS erosion control, 10.48 AC clearing & grubbing, 26,497 CY regular excavation, 50 SY 1" depth milling, 734 TN 1.5" asphaltic pavement, 1 EA storm inlet manholes, 72 SY 6" concrete pavement, 4,900 LF fencing, 10 EA single swing gate, 34,134 SY performance turf, 2 EA 8" gate valve, 4 EA fire hydrant, 291 LF 4" PVC sanitary sewer pipe.
CountyFL
Posted
Oct 1, 2026
Nov 6, 2026
Construct ±0.443 miles of rural section asphalt roadway with side ditches, conversion of an existing borrow pit to a storm water management facility, new storm sewer collection system, new water main and sanitary sewer force main, traffic signs and traffic paint/markings. Work includes 1 LS mobilization, 1 LS erosion control, 10.48 AC clearing & grubbing, 26,497 CY regular excavation, 50 SY 1" depth milling, 734 TN 1.5" asphaltic pavement, 1 EA storm inlet manholes, 72 SY 6" concrete pavement, 4,900 LF fencing, 10 EA single swing gate, 34,134 SY performance turf, 2 EA 8" gate valve, 4 EA fire hydrant, 291 LF 4" PVC sanitary sewer pipe.
CityPA
Posted
Sep 23, 2026
Oct 21, 2026
Work includes providing all labor, tools, materials, equipment, transportation, and temporary facilities required to construct the parking, accessibility, and site improvements The project generally consists of repaving existing asphalt and gravel parking lots; constructing new pedestrian trails; installing associated utilities, signage, and site furnishings; and completing all necessary grading, topsoil placement, and site restoration.