CityOH
Posted
Oct 13, 2026
Oct 27, 2026
Leeson Avenue Drainage Project RFP
The installation of approx. 3,800'. of storm sewer conduit and structures.
Description: Work includes 1 LS excavate insertion or receiving pits and pre-cctv; 3 EA potholing; 70 LF remove & replace existing 24" CMP with new 20" hdpe sdr17 by open trench; 200 LF rehabilitate existing 24" CMP with new 20" HDPE sdr17 by slipline w/ pressurized grout (revocable); 260 cy void backfill with pressurized grouting (revocable); 1 EA install new storm drain catch basin; 300 SF asphalt cold plane - 2"; 5 ton hma (type a) pg-64-16; 1 LS backyard restoration; 500 SF seal coat parking area; 200 LF remove & replace existing 24" cmp with new 20" hdpe sdr17 by open trench.
City · CA, US
Solicitation files and supporting documents for this bid.
Adjacent opportunities open for bidding right now.
CityOH
Posted
Oct 13, 2026
Oct 27, 2026
The installation of approx. 3,800'. of storm sewer conduit and structures.
Special DistrictPA
Posted
Oct 14, 2026
Nov 3, 2026
Installation of approx. 1,400 LF of 6" water main, 15 residential service lines, ties to existing mains, associated fittings and valves, restoration of disturbed areas and overlay paving of streets.
CityCA
Posted
Oct 8, 2026
Nov 5, 2026
Sewer main replacement project. Project will remove seven (7) manholes, construct four (4) new manholes, and replace approx. 1,100 LF of existing sewer main. project will replace the existing 8" Vitrified Clay Pipe (VCP) sewer with 10" VCP sewer at the same line and grade, thereby eliminating existing deficiencies in hydraulic capacity in this reach of sewer and providing adequate capacity for ultimate flows based on the City's Sewer Master Plan.
CityGA
Posted
Aug 27, 2026
Nov 5, 2026
Drainage improvement work consists of the following: Stormwater drainage improvements along Lakeland Avenue including curb and gutter, storm pipes and sidewalk, Dredging of the existing channel of One Mile Branch, Construction of a 1.25-acre regional stormwater pond to the west of One Mile Branch, Construction of a 0.5-acre stormwater pond behind the Senior Center.
Decision makers connected to this RFP from Town of Los Gatos.