RFP Database

Find Rehabilitation RFPs and Bid Opportunities - Page 2

Find open Rehabilitation RFPs from state agencies, local governments, school districts and higher ed institutions.

20 opportunities shown.

  1. Adams Lane Tank Rehabilitation

    Work consists of the rehabilitation and repainting of a 5.0 mg welded steel standpipe potable water storage tank including replacement of interior and exterior tank coatings, improvements to existing tank accessories.

  2. SR49 Emergency Sewer Rehabilitation

    The City is soliciting bids to replace approximately 350 linear feet of 6-inch gravity sewer pipe along SR 49 within the Caltrans right-of-way, installing it along the existing alignment and grades.

  3. Wayne County

    CountyMI

    Housing and Commercial Rehabilitation Services

    The County is requesting responses to select qualified contractors to expand the current list of pre-qualified contractors to provide housing and/or commercial building rehabilitation services.

  4. Tower Ave Tank Rehabilitation

    Project shall be defined as providing supplies, machinery, equipment, tools, superintendence, labor, insurance and other accessories and services necessary to sandblast, make necessary repairs and install the new coating system.

  5. Citywide Infrastructure Rehabilitation and Improvements

    Infrastructure rehabilitation and improvements, including unclassified excavation, pavement cutting and patching, concrete sidewalk installation/removal, curb modifications, cold milling bituminous pavement, bridge expansion joint rehabilitation, flashing beacon and sign assemblies, and urban right-of-way restoration.

  6. Huntsville Utilities

    Special DistrictAL

    Water Tank Rehabilitation RFP

    The scope of work includes the interior rehabilitation and miscellaneous metal repairs and improvements of a water tank with a three-million-gallon reservoir with a 113-foot diameter and a high-water level of 40 feet

  7. Terminal Parking Lot Rehabilitation

    The project shall consist of furnishing all labor, materials, and equipment and performing all work required to satisfactorily complete the Terminal Parking Lot Rehabilitation project.